Kensdock Report: Last U.S. smelting plant closing will cost outdoor sportsmen

flounder 045

The closing of the last United States  lead processing  plant will force all lead to  be shipped in from over seas, with the exception of recycled lead. The closing is a direct result  of  a 1000% increase in new  U.S. DEP requirements. Do not blame President Obama, the rules were  set in motion before he was elected.   The cost of processed lead in the United States will skyrocket.  Hunters, fishermen and the target shooter will feel a direct hit. Lead jig heads and ammunition  are expected to rise. The U.S. military stock piled ammunition  at a historic rate prior to the closing. This caused an ammo shortage and a record price increase  in itself.  However,  the military induced  price increase  will pale in comparison of what is to come.  Aviation fuel requires 2g lead per gallon. The extra cost will push jet fuel cost   and without doubt increase  airfare.  The smelting plant closing will reach far beyond increasing the cost of outdoor sports. It will create a redistribution of wealth, pushing more U.S. dollars to china and peru.  The smelting plant was in business for a 120 years. Now it becomes a victim of the American manufacturing blight,  joining the  U.S. steel plants in Pennsylvania and the auto manufacturing plants of Detroit .

 

 

  1 comment for “Kensdock Report: Last U.S. smelting plant closing will cost outdoor sportsmen

  1. Jdm
    April 9, 2014 at 3:25 pm

    What was the damage caused by the plant?

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: